Book a consultation
ReliabilityX Blog

Real results from real
engagements.

How asset-intensive operations turned reliability investment into measurable business value — less downtime, lower cost, higher output.

Case Studies

5 engagements
01
Restoring Control and Performance at the Momence Plant
ReliabilityX Blog

Restoring Control and Performance at the Momence Plant

A struggling facility regained operational control through a structured reliability transformation — reducing unplanned downtime, realigning the maintenance team, and building a sustainable performance baseline.

65%
Momence Plant’s OEE rose
$1.8M
annual savings
Read case study →
02
Riverside Plant Reclaims Control and Cuts Costs with ReliabilityX
ReliabilityX Blog

Riverside Plant Reclaims Control and Cuts Costs with ReliabilityX

The Riverside Plant in Wisconsin was facing mounting operational pressure. Throughput was stagnant, costs were rising, and defective packaging was a recurring issue.

73%
OEE Jump
$1M
annual savings
Read case study →
03
ReliabilityX Unlocks Throughput and Cost Savings for The Little Potato Company
ReliabilityX Blog

ReliabilityX Unlocks Throughput and Cost Savings for The Little Potato Company

The Little Potato Company’s Multivac production line in Edmonton, Alberta was falling short of its design capacity. Machines were underperforming, costs were rising, and the workforce lacked the skills to identify and resolve operational issues

56%
Throughput increased
$377,000
Saving
Read case study →
04
ReliabilityX Delivers $8M Margin Gain on Bosch Line for The Little Potato Company
ReliabilityX Blog

ReliabilityX Delivers $8M Margin Gain on Bosch Line for The Little Potato Company

The Little Potato Company’s Edmonton facility was operating a Bosch Line that consistently fell short of its designed production capacity, and the gap between expected and actual output continued to widen.

$8M
Margin Gain
60%
Reduced weight product
Read case study →
05
ReliabilityX Breaks Throughput Records on Rotary Line
ReliabilityX Blog

ReliabilityX Breaks Throughput Records on Rotary Line

When The Little Potato Company launched its new facility in Nisku, Alberta, the rotary line quickly became a bottleneck. Machines were not running at design rate, customer orders were missed, and operational costs were climbing.

55%
Increased Monthly throughput
Read case study →

Join our Newsletter

Get the latest updates on reliability, maintenance excellence, and operational performance delivered to your inbox.

No spam, unsubscribe anytime.
Thank you for subscribing!
Look out for our next reliability brief.